Denizli 1st Organized Industrial Zone Waste Water Treatment Plant Construction is one of the largest treatment plants in Turkey, built within the Organized Industrial Zones. It is the construction of a central wastewater treatment plant consisting of physical (mechanical), chemical, biological and sludge dewatering units with a capacity of 55,860 m³/day, equivalent to 280,000 population, on an area of 30,000 m². The project, which was completed in 11 months, received the “discharge” permission from the T. C. Denizli Provincial Directorate of Environment in a short period of 3 months, and entered the Turkish construction history in two important issues that can be considered a record (1st time, 2nd cost).

 